Reduction in setup time in a rubber artifacts company through the SMED methodology

Authors

DOI:

https://doi.org/10.31510/infa.v23i1.2328

Keywords:

SMED methodology, Operational efficiency, Time reduction, Rubber products

Abstract

This paper proposes a reduction in setup time at a rubber products company through the SMED (Single Minute Exchange of Die) methodology. This methodology aims to optimize tool change and machine adjustment processes, thereby reducing the time expended on these operations. The objective of this study is to identify the relevance of setup time reduction in a rubber products manufacturing cell using the SMED methodology. The research methodology utilized a literature review to explore key research elements, the stages of application, and the associated benefits. A specific case study was conducted, focusing on the proposed steps for implementing SMED within the production cell. This approach aimed to concretely demonstrate the benefits of this method in terms of efficiency and productivity. The proposal includes a detailed description of the necessary implementation steps, from activity identification to the execution of continuous process improvements. Anticipated outcomes include reduced operational costs, increased production flexibility, improved product quality, and enhanced employee satisfaction. By sharing these insights, this article aims to contribute to the sustainable development of both the target company and the broader business and academic community interested in continuous improvement and innovation practices.

Views: 177Downloads: 128

Downloads

Download data is not yet available.

References

BASTOS, A. L. A. SMED e redução do tempo de setup em um processo produtivo. In: CONGRESSO BRASILEIRO DE ENGENHARIA DE PRODUÇÃO, 6., 2016, Paraná. Anais [...]. Paraná, 2016. p. 1-9.

CAKMAKCI, M.; KARASU, M. K. Set-up time reduction process and integrated predetermined time system MTM-UAS: a study of application in a large size company of automobile industry. International Journal of Advanced Manufacturing Technology, v. 33, n. 3-4, p. 334-344, 2007. DOI: https://doi.org/10.1007/s00170-006-0466-x

CALHADO, M. P.; FRANCE, L. D. A.; ROCHA, Y. B.; OLIVEIRA, F. M. V. B.; OLIVEIRA NETO, P. C. Implantação do método de troca rápida de ferramentas no setor de usinagem em uma indústria de autopeças. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 35., 2015, Fortaleza. Anais [...]. Fortaleza, 2015.

CECHECT, I. A.; KAININ, J. I.; COSTA, C. A.; LUCIANO, M. A. Implantação dos conceitos de TRF em uma empresa do setor de plásticos. In: SIMPÓSIO DE ENGENHARIA DE PRODUÇÃO, 2008, Bauru. Anais [...]. Bauru, 2008.

CORAZZA, E. J. Otimização do tempo de setup no setor de usinagem, em uma empresa de processamento de alumínio de Joinville/SC – Brasil. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 36., 2016, João Pessoa. Anais [...]. João Pessoa, 2016.

GAZEL, W. F.; SALLES, J. A. A.; FEITOSA, W. H. Redução do tempo de setup em uma linha de ingredientes sólidos de uma fábrica alimentícia do PIM: estudo de caso. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 34., 2014, Paraná. Anais [...]. Paraná, 2014. p. 15-26.

GIL, A. C. Como elaborar projetos de pesquisa. 7. ed. Barueri: Atlas, 2022. DOI: https://doi.org/10.26694/2317-3254.rcp.v11i1.5442

HIRANO, H. JIT implementation manual: the complete guide to just-in-time manufacturing. [S. l.]: CRC Press, 2009. v. 2. 216 p. DOI: https://doi.org/10.1201/b10229

MCCARTHY, R. Toolroom management: presetting increases profits and productivity. MoldMaking Technology, [s. l.], 2006.

MÉNDEZ, J. D. M.; RODRÍGUEZ, R. S. Set-up reduction in an interconnection axle manufacturing cell using SMED. The International Journal of Advanced Manufacturing Technology, v. 84, p. 1907-1916, 2015. DOI: https://doi.org/10.1007/s00170-015-7845-0

PALOMINO, R.; LUCATO, A. V. R. Implementação da metodologia SMED: um estudo de caso em uma célula de produção do ramo automobilístico. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 36., 2016, Paraíba. Anais [...]. Paraíba, 2016. p. 1-26.

REIS, M. E. P.; ALVES, J. M. Um método para o cálculo do benefício econômico e definição da estratégia em trabalhos de redução do tempo de setup. Revista Gestão e Produção, São Carlos, v. 17, n. 3, p. 579-588, 2010. DOI: https://doi.org/10.1590/S0104-530X2010000300011

SAMPIERI, Roberto Hernández; COLLADO, Carlos Fernández; LUCIO, María del Pilar Baptista. Metodologia de pesquisa. Tradução: Daisy Vaz de Moraes. Revisão técnica: Ana Gracinda Queluz Garcia, Dirceu da Silva, Marcos Júlio. 5. ed. Porto Alegre: Penso, 2013. E-book. Disponível em: https://integrada.minhabiblioteca.com.br/reader/books/9788565848367/pageid/1. Acesso em: 20 out. 2022.

SHINGO, S. A revolution in manufacturing: the SMED system. Cambridge, MA: Productivity Press, 1985. 384 p.

SHINGO, S. O sistema de troca rápida de ferramentas. Porto Alegre: Bookman, 2000. 327 p.

SILVA, C.; PEREIRA, S. P. S. Implementação da metodologia SMED no setor das prensas de corte de chapa. 2014. Dissertação (Mestrado) – Faculdade de Ciências e Tecnologia, Universidade de Coimbra, Coimbra, 2014. Disponível em: https://estudogeral.uc.pt/bitstream/10316/39073/1/Implementacao%20da%20Metodologia%20SMED%20no%20Setor%20das%20Prensas%20de%20Corte%20de%20Chapa.pdf. Acesso em: 7 abr. 2024.

SILVA, J. P. N.; ALSISI, R. B.; COSTA, F. G. Aplicação da troca rápida de ferramentas em uma empresa de corte e dobra de aço. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 36., 2016, Paraíba. Anais [...]. Paraíba, 2016. p. 1-13.

XAVIER, C. A. R.; CARVALHO, S. M. A melhoria do setup de uma empresa de usinagem: um estudo de caso em Porto Velho. Revista Interdisciplinar Científica Aplicada, v. 8, n. 2, p. 12-34, 2014.

Published

2026-06-30

Issue

Section

Industrial Production Technology

How to Cite

PEREIRA, F. M. et al. Reduction in setup time in a rubber artifacts company through the SMED methodology. Interface Tecnológica, v. 23, n. 1, p. 264–272, 30 June2026.